Tuesday, March 12, 2019

It's finished!!!!!!!

Finished the back splash.

 Meat, turkey and pizza in the freezer.
 Apples; peppers, eggplant, corn; broccoli in the crispers

Cabbage and cauliflower
 
Top drawer in counter by the fridge
 condiments and yogurt for the fridge.
Drawer by the stove.
 Corner cabinet.
 First cabinets in place. (Used Lego blocks as a spacer.)

 Final picture of the counters.
Contents of the fridge.
 Serving dishes and copper pots.
 Mixing bowls on the left and pans on the right.
 Everything in place.
 I added three outlets above the lower cabinets and a light switch by the fridge.


3 comments:

  1. Wow, what a nice job you did!! Looks great and I look forward to seeing Ann's reaction.

    ReplyDelete
  2. Such detail! You did a wonderful job.

    ReplyDelete
    Replies
    1. Thanks Barbara. It's going to be hard to let go of this one but Añn is a great lover of minis so I know it's going to a good home.

      Delete